Benefits download the presentation
Side view of 1200 ton Plant

Faster
- Concurrent construction
- Modular: 18-28 Weeks(8-12 weeks after receiving chillers)
- Built in place: up to 14 months
- Speeds design
- Allows Consulting Engineer to specify parameters to Custom Chiller Plant Manufacturer
- RAI designs actual plant meeting design criteria
- 3D Solid Works design
- FEA analysis
- Base structurally certified
- Seismic
- Improved co-ordination of trades and testing
- Decreases construction time
- Controlled Manufacturing
Environment:
- Improved Co-ordination of trades and testing
- Faster construction results in lower cost
Better
- RAI Modular Chiller Plant:
- Performance and Operation testing at Factory
- ETL list entire plant or shipping section
- Engineer and Owner inspection prior to shipping and at manufacturing milestones
- Single source responsibility